Quality Performance Measurement

  • M.S.A. is conducted on all gauges referred in control plan
  • Process Validation is carried out
  • Calibration is done as per plan
  • Layout plan as per Annual Layout Plan & Product Audit  is     conducted
  • Pattern & core Box History records are maintained
  • Casting Process Sheet (CPS) is prepared for all customers & all parts
  • Final Inspection Control Plan(FICP)is prepared for all customers & all parts.
  • Incoming Raw Material Control Plan is prepared
  • In process control plan is prepared.
  • Process Failure Mode & Effective Analysis (PFMEA)is prepared
  • Radiation Containment is checked for incoming raw material
  • NDT facility (Outsourced)--- RT, UT, MPT, DP
  • Heat treatment furnace with auto timer ,temp controller & online graph software.
  • The sub –contractor Quality & Delivery performance is monitored
  • SPC is conducted  for Mould Hardness, Casting Hardness & critical machining dimensions through software.
  • Traceability records of parts is kept for ten years & Spectro test pieces is retained for ten years